UNDP/GEF TISZA MSP DEMONSTRATION PROJECT
Selected Measures Towards Integrated
Land and Water Management
in Upper Tisza
PROGRESS REPORT
VELYKY BYCHKIV (UKRAINE) ­ BOCICOIU-MARE (ROMANIA)
Vasyl Manivchuk, Olena Marushevska
UNDP/GEF Tisza MSP
Kosice November 2009

Introduction
Main objective of the project:
to demonstrate
Innovative + Cost-ef ective solutions
to the typical environmental problems
faced in Upper Tisza floodplain
with guidelines for their further replication

Project components:
1. Improvement of communal waste
management system
Two goals:
1. to develop vil age solid waste
management system
2. to introduce separate waste
col ection (plastic bot les)
Methods:
· capacity building of municipal
services ( purchasing of containers
and press)
· Environmental awareness raising
campaigns

Progress so far (1)
· Around 350 containers purchased
· Press obtained
1st permanent Unit of PLASTIC
RECYCLING is established in
Rakhiv rayon
Contribution of Velyky Bychkov vil age council
and Ecobat Shuravi:
Discounts on the costs of containers
Platforms for the containers for glass paper
Sustainable operation of the system

Progress so far (2)
· Joint UA-RO environmental campaign
"Two banks ­ One clean Tisza"

Sustainability and replication:
· Further spreading of the waste management
system for the whole
REGIONAL PLANS TO
DEVELOP WASTE MANAGEMENT SYSTEM
Rakhiv region - with involvement of Velyky
Bychkiv
· Plans to col ect separately also glass and paper

Project components:
2. Local flood protection plan
Flood July 2008 ­ most of
damage done by in-vil age
streams
Elaboration of dif erent
scenarios of in-vil age stream
flood management depending on
water level in Tisza
+
Design and construction works

Results to be archived:
· FIRST LOCAL Flood Management Plan
-- shift of
attention from large rivers to small streams
· One of the
first applications of requirements of EU
FLOOD DIRECTIVE
: development of flood risk and flood
hazard maps
· Close public involvement and
PUBLIC CONSULTATION --
key to sustainability
· PRACTICAL ACTIONS
with involvement of public
(cleaning of riverbed, creation of retention pond etc--to
be defined)

Project components:
3. Restoration of habitats
Ukraine
· FIRST SCIENTIFIC METHODOLOGY
of friendly
habitat restoration at mountainous creeks by
Institute of Hydrobiology;
· On-job training
of forest enterprise stuf
· RIVER TROUT
as indicator of the habitat
restoration

Mountainous creek before cleaning

Works done
Cleaning of the creek from
wooden residues and
restoration of its weaving
and establishment of the
cascades (done by Dilove
forest enterprise)
Introduction of the
marcozoobentos from
undisturbed creek
(done by Institute of
Hydrobiology)

Restored habitat ­ trout to be back

Project components:
3. Restoration of habitats
Romania
· Assessment of
ECOLOGICAL
POTENTIAL
of the lake
Teplytsya as
recreational zone
· Practical measures to
CONSERVE LAKE
HABITAT
·

Project components:
4. Local wastewater treatment facilities
· Demonstration of
possible
LOCAL and
COST-EFFECTIVE
BIOLOGICAL
treatment
facilities
· Decrease of
DIRECT
INFLOW
of nutrients into
transboundary part of
Tisza
Boarding school
The actual co-finding from the side of Rakhiv regional
administration ­ is more than 50% of the project
(preparatory works and sewage works)

Project components:
5. Re-opening of hydrological gauging station
· monitoring data
ON-LINE for UA and RO partners
· The
ONLY station for Shopurka river (tributary of
Tisza ­ the catchment 286
2)
· LARGE
partner contribution ­ equipment
(Zakarpattya Hydromet)
Additional co-financing ­ provision of a regular stuf of
the station from 2010 by Zakarpat ya hydromet
....... Works on the station construction started

Thanks to all for cooperation
!